« 263 |365 Pegs | Main | 265 |365 Transformers »

June 14, 2010

264 |365 Design and Builds

Link Up Paint SuppliesIf ever there was a great example of businesses not being able to predict the future it would be this one. In this photo, I was at a meeting at Link-up Paint Supplies, but when it was first built it was made to be a courier depot for CourierPost. I happened to be the Operations Manager at the time.
 
The inherent problem with ‘design and build’ developments is they can take a number of years to design and build them. In this time business can change significantly. In CourierPost’s case it grew significantly from the time they said yes to the time they moved in, and it was too small before they moved.
 
I’ve experienced the same thing at Agoge. From both businesses I’ve learned that moving into existing buildings can reduce the risk of getting it wrong, but there is always trade offs.

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d83452a2a769e201538e5429a1970b

Listed below are links to weblogs that reference 264 |365 Design and Builds:

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

The comments to this entry are closed.

andrewnicol.net

  • andrewnicol.net sidebar Fanatical about people, social enterprise, reducing poverty, creative thinking, leadership, 365 photography, being a great Husband/Dad and God.

    My mantra is to 'lead and live vividly'.

    These are my ramblings and photos

    Follow Me

    Enter your email address to subscribe to this blog and receive notifications of new posts by email.

    Join my Facebook Page Follow me on Twitter RSS Feed


    © 2006 – 2012 Andrew Nicol.
    All Rights Reserved.

My Other Accounts

Facebook LinkedIn Technorati Twitter Twitter YouTube

My Links